Silvervingen SWE31

Silvervingen SWE31
Launch 2017

söndag 9 juni 2013

Interior installed



Rudder being finished. Interior installed. The pictures does not make Fredrik's work justice. The finish is immaculate.

lördag 8 december 2012

Red lead paint in the works


Work is progressing with red lead paint inside and outside below waterline.